RIVER’S HYDRO POWER POTENTIAL
In 2013 we finalized the construction of Ružbašská Miľava dam on the Poprad river, which is now ready to generate green energy.
The Ružbašská Miľava dam is one from the set of dams on the Poprad river. The river´s potential to produce electricity will be harnessed as a part of renewable energy sources program which contributes also to the flood protection of the whole Poprad river basin.
The power plant runs on two Kaplan turbines with a built-in electricity producer technology and maximum power capacity of 1MW. The generated energy will be distributed into public distribution network.
Company history
2016
JOINING EG
AQUA-EKO becomes a member of ENERGY GROUP.
2009
ACQUISITION OF DAM
Acquisition of the unfinished building of Ružbašská Miľava dam.
2011
NEW FISH LADDER
A new modern fish ladder is built enabling the fish to migrate up to the Ružbašská Miľava dam.
2013
Trial operation
After the construction is finalized, the Ružbašská Miľava dam is put into trial operation.
BOARD OF DIRECTORS
Ing. Andrej Obrtlík
Chairman of the Board of Directors
Ing. Eva Krčová
Board Member
Ing. Štefan Vystavel
Board Member